Solarpunk village with solar canopies and water channels

8 ways to participate

Choose the route that matches your role. Leave with a concrete first deliverable.

Each pathway asks for the minimum information needed to produce something useful — a pledge, an access decision, a model, a brief or a signature. No pathway asks for money today.

01Pathways

Eight visual ways to participate this week.

01

Citizens & supporters

Reserve a place in the citizen energy pledge

Register a non-binding pledge towards the proposed $10bn Spanish independence programme.

Pledge confirmation, instrument terms when the vehicle is authorised, and the regional allocation you chose.

Confirmation in minutes

02

Families & founding residents

Apply to the first self-sufficient community cohort

Energy, water, food and education self-sufficiency, designed with the founding residents.

Cohort brief, site shortlist, participation model and the questions we still need to answer together.

Brief within 5 working days

03

Professional investors

Request access to the investor data room

Staged, watermarked diligence material with explicit evidence labels on every figure.

Access decision, model assumptions, downside cases and the named approval gates.

Access decision in 48 h

04

Industrial operators

Commission a robotic master plan

A site-specific plan for robotised inspection, cleaning, handling and maintenance.

Task map, autonomy levels, human authority gates, phased capex and modelled payback range.

Draft plan in 10 working days

05

Industry & landowners

Build a battery financial and co-investment plan

Storage sized against your own load, tariff and grid position — with a co-investment structure.

Sizing range, cost stack with optimised value chain, tariff-shifting model and co-investment options.

Model in 7 working days

06

Public figures & leaders

Sign the energy independence memorandum

A public, non-financial commitment to evidence-led energy independence.

Your signature on the public register once verified, plus the memorandum text and principles.

Signature verified in 72 h

07

Municipalities & regions

Request a municipal node readiness brief

See what your municipality could host, and what blocks it today.

Node brief with capacity, land, grid, water and permitting constraints, plus a first project candidate.

Brief in 10 working days

08

Energy-intensive buyers

Run a value-chain cost reduction audit

Screen your energy value chain against our catalogue of cost-reduction levers.

Ranked levers, indicative savings ranges with assumptions, and the evidence each one needs.

Screening in 5 working days

Deliverables contain modelled and proposed outcomes, clearly labelled. They are not audited operating results or a financial offer.